Problem: How to transfer important signals from stacker/reclaimer to control room.
Background: Stacker/Reclaimers can be found in cement, power, steel industries where bulk movement/storage is needed. Stackers receive material from other stockyard equipment via a conveyor network and deposit it in a bunker or pile. Reclaimers remove the same material and deliver it to other stockyard equipment via a conveyor network.
It is very important to have information such as movement of stacker/reclaimer to control room while in operation. For example, if reclaimer is to be started, the reclaimer yard conveyor has to be started first and the same signal is to be given to the reclaimer. In the same way, the stacker yard conveyor has to be started after starting the stacker machine only. So stacker running signal is sent to the Central Control Room (CCR), which in turn, sends signal to stacker yard conveyor. If there is a delay in these signals then tippler chute will get clogged. The main requirement of the signal interlocking is to prevent the clogging of both machine.
Generally, all industries like to go with the automation system for the machines, If stacker/Reclaimer is to be operated in auto mode, no. of inputs/outputs are required to be transferred from machine to CCR (Example: - Travel Speed reference , Speed feedback, Machine position etc) |